<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Riverside Boat Works</title>
	<atom:link href="http://www.riversideboatworks.com/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.riversideboatworks.com</link>
	<description></description>
	<lastBuildDate>Fri, 17 Sep 2010 00:59:52 +0000</lastBuildDate>
	
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title></title>
		<link>http://www.riversideboatworks.com/2010/09/572/</link>
		<comments>http://www.riversideboatworks.com/2010/09/572/#comments</comments>
		<pubDate>Fri, 17 Sep 2010 00:59:52 +0000</pubDate>
		<dc:creator>Riverside Boatworks</dc:creator>
				<category><![CDATA[Shop notes]]></category>

		<guid isPermaLink="false">http://www.riversideboatworks.com/?p=572</guid>
		<description><![CDATA[Here are some shots of the windshield/windows that just got installed on our trawler project. The windows were made by Diamond SeaGlaze,  a Canadian company that has a great reputation for building quality windows
In this picture  Steve is taking care of details right before he installs the windows. The windshield frame is constructed of marine [...]]]></description>
			<content:encoded><![CDATA[<p id="top" />Here are some shots of the windshield/windows that just got installed on our trawler project. The windows were made by Diamond SeaGlaze,  a Canadian company that has a great reputation for building quality windows</p>
<p><img class="aligncenter size-medium wp-image-573" title="windshield 1" src="http://www.riversideboatworks.com/wp-content/uploads/2010/09/windshield-1-300x225.jpg" alt="windshield 1" width="300" height="225" />In this picture  Steve is taking care of details right before he installs the windows. The windshield frame is constructed of marine ply that is over laid with epoxy/fiberglass materials with douglas fir trim on the interior</p>
<p><img class="aligncenter size-medium wp-image-575" title="windshield 2" src="http://www.riversideboatworks.com/wp-content/uploads/2010/09/windshield-21-300x225.jpg" alt="windshield 2" width="300" height="225" />This picture shows the port side window being installed.</p>
<p><img class="aligncenter size-medium wp-image-576" title="windshield 3" src="http://www.riversideboatworks.com/wp-content/uploads/2010/09/windshield-3-300x225.jpg" alt="windshield 3" width="300" height="225" /></p>
<p>This is how the windows and windshield look after they are all installed.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.riversideboatworks.com/2010/09/572/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title></title>
		<link>http://www.riversideboatworks.com/2010/08/566/</link>
		<comments>http://www.riversideboatworks.com/2010/08/566/#comments</comments>
		<pubDate>Wed, 04 Aug 2010 16:34:58 +0000</pubDate>
		<dc:creator>Riverside Boatworks</dc:creator>
				<category><![CDATA[Shop notes]]></category>

		<guid isPermaLink="false">http://www.riversideboatworks.com/?p=566</guid>
		<description><![CDATA[We have had a hectic spring and first half of the summer summer finishing major projects on Zeeto-new teak decks and sealing the  teak decks of Electra with a Coelan ureathane varnish that is popular in Europe and starting to make inroads here in the states. We have posted photos of some of Zeetos deck [...]]]></description>
			<content:encoded><![CDATA[<p id="top" />We have had a hectic spring and first half of the summer summer finishing major projects on Zeeto-new teak decks and sealing the  teak decks of Electra with a Coelan ureathane varnish that is popular in Europe and starting to make inroads here in the states. We have posted photos of some of Zeetos deck work in the Projects- Zeeto.  Heres a photo of a paint job we are wrapping up</p>
<p><img class="aligncenter size-medium wp-image-568" title="August 2010 Paint pic 019" src="http://www.riversideboatworks.com/wp-content/uploads/2010/08/August-2010-Paint-pic-019-300x225.jpg" alt="August 2010 Paint pic 019" width="300" height="225" />Mike of Mikes Sign is applying the vinyl stickers</p>
<p>This is a photo of Electra&#8217;s decks as she was sailing to Bayfield last week</p>
<p><img class="aligncenter size-medium wp-image-569" title="July 2010 166" src="http://www.riversideboatworks.com/wp-content/uploads/2010/08/July-2010-166-300x225.jpg" alt="July 2010 166" width="300" height="225" />By coating the decks we are hoping to extend the lifetime of the decks and stop all nuisance leaks that are so common older wooden decks.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.riversideboatworks.com/2010/08/566/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title></title>
		<link>http://www.riversideboatworks.com/2010/03/490/</link>
		<comments>http://www.riversideboatworks.com/2010/03/490/#comments</comments>
		<pubDate>Wed, 31 Mar 2010 22:40:59 +0000</pubDate>
		<dc:creator>Riverside Boatworks</dc:creator>
				<category><![CDATA[Shop notes]]></category>

		<guid isPermaLink="false">http://www.riversideboatworks.com/?p=490</guid>
		<description><![CDATA[It&#8217;s the end of March and Duluth temps were in the high 60&#8217;s.  Greorge and Jan Owen are prepping Electra&#8217;s masts for a 5 year touch up paint job. We are going to be trying a product out that is more popular in Europe- &#8221; Coelan&#8221; on her teak decks. It is a urethane/varnish that [...]]]></description>
			<content:encoded><![CDATA[<p id="top" />It&#8217;s the end of March and Duluth temps were in the high 60&#8217;s.  Greorge and Jan Owen are prepping Electra&#8217;s masts for a 5 year touch up paint job. We are going to be trying a product out that is more popular in Europe- &#8221; Coelan&#8221; on her teak decks. It is a urethane/varnish that has a reputation for outlasting any varnish product on the market and because it remains flexible can be used to seal stubborn deck leaks.  We will have more detail info on this later in the spring.  <em>Classic Boat,</em> a british magazine has done some lengthy articles and tests with this product.<img class="aligncenter size-medium wp-image-491" title="March 2cd group 2010 011" src="http://www.riversideboatworks.com/wp-content/uploads/2010/03/March-2cd-group-2010-011-300x225.jpg" alt="March 2cd group 2010 011" width="300" height="225" />That&#8217;s George running the sander prepping Electras&#8217; spruce main mast</p>
]]></content:encoded>
			<wfw:commentRss>http://www.riversideboatworks.com/2010/03/490/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title></title>
		<link>http://www.riversideboatworks.com/2010/03/468/</link>
		<comments>http://www.riversideboatworks.com/2010/03/468/#comments</comments>
		<pubDate>Wed, 24 Mar 2010 17:31:07 +0000</pubDate>
		<dc:creator>Riverside Boatworks</dc:creator>
				<category><![CDATA[Shop notes]]></category>

		<guid isPermaLink="false">http://www.riversideboatworks.com/?p=468</guid>
		<description><![CDATA[New wood going in to the bow section of Zeeto. We had to remove all the degraded wood and cut in a new bow sprit support timber.
This photo shows the extent of material we had to cut away. The stem was capped with a copper piece and this protected the end-grain of the stem for [...]]]></description>
			<content:encoded><![CDATA[<p id="top" />New wood going in to the bow section of Zeeto. We had to remove all the degraded wood and cut in a new bow sprit support timber.</p>
<p><img class="aligncenter size-medium wp-image-484" title="March 2cd group 2010 004" src="http://www.riversideboatworks.com/wp-content/uploads/2010/03/March-2cd-group-2010-004-300x225.jpg" alt="March 2cd group 2010 004" width="300" height="225" />This photo shows the extent of material we had to cut away. The stem was capped with a copper piece and this protected the end-grain of the stem for decay.</p>
<p><img class="aligncenter size-medium wp-image-485" title="March 2cd group 2010 008" src="http://www.riversideboatworks.com/wp-content/uploads/2010/03/March-2cd-group-2010-008-300x225.jpg" alt="March 2cd group 2010 008" width="300" height="225" />This photo is the same stage looking forward.</p>
<p><img class="aligncenter size-medium wp-image-486" title="March 2cd group 2010 014" src="http://www.riversideboatworks.com/wp-content/uploads/2010/03/March-2cd-group-2010-014-300x225.jpg" alt="March 2cd group 2010 014" width="300" height="225" />This photo shows the new timber fit in place</p>
<p><img class="aligncenter size-medium wp-image-487" title="March 2cd group 2010 015" src="http://www.riversideboatworks.com/wp-content/uploads/2010/03/March-2cd-group-2010-015-300x225.jpg" alt="March 2cd group 2010 015" width="300" height="225" /> From the bow- and Alex is looking over his handiwork, getting ready to permanently install.</p>
<p>Spring is here!   We can work outside again- unusually warm temps for late March are letting us start up our outside work.  We are back at it preparing the Zeeto&#8217;s decks for a teak decking overlay.  Last fall we removed the bulk of the old paint built up over the years. Our first task this spring is to sand  close to the cabins and deck edges and to make sure the subdecking is sound.  We found some serious decay in the subdeck plywood and structural members at the stem head directly under the bowsprit. We removed the bowsprit and are cutting out all the bad wood and installing new material in this area</p>
<p><img class="aligncenter size-medium wp-image-473" title="Mar 2010 052" src="http://www.riversideboatworks.com/wp-content/uploads/2009/12/Mar-2010-052-300x225.jpg" alt="Mar 2010 052" width="300" height="225" />This is what we saw when we removed the loose fiberglass. The wood under the bow sprit was soft so we had to lift off the bowsprit and find the extent of the degraded material.</p>
<p><img class="aligncenter size-medium wp-image-476" title="Mar 2010 012" src="http://www.riversideboatworks.com/wp-content/uploads/2009/12/Mar-2010-0121-300x225.jpg" alt="Mar 2010 012" width="300" height="225" />This is how far the decay had gotten. We are removing all the bad wood and installing douglas fir material and then installing marine plywood and sheathing the ply with  10 oz fiberglass set in epoxy resin</p>
<p><img class="aligncenter size-medium wp-image-482" title="Mar 2010 016" src="http://www.riversideboatworks.com/wp-content/uploads/2010/03/Mar-2010-016-300x225.jpg" alt="Mar 2010 016" width="300" height="225" />Here is another view from further astern.</p>
<p>Zeeto deck work- Fall 2009 , This is a series of photos of the deck after we sanded and chipped off the build up paint and various coatings that have been applied over the years. The edges and perimeters still need to be done with smaller sanders. We used an 8&#8243; disc sander with 36 grit paper to do the bulk of this initial removal.</p>
<p><img class="aligncenter size-medium wp-image-469" title="Dec 1 2009 006" src="http://www.riversideboatworks.com/wp-content/uploads/2009/12/Dec-1-2009-006-300x225.jpg" alt="Dec 1 2009 006" width="300" height="225" />this shot is lookin forward on the starboard side</p>
<p><img class="aligncenter size-medium wp-image-470" title="Dec 1 2009 009" src="http://www.riversideboatworks.com/wp-content/uploads/2009/12/Dec-1-2009-009-300x225.jpg" alt="Dec 1 2009 009" width="300" height="225" />this shot is on the port side looking at the cockpit area.  After all the detail sanding is done next to coamings and cabinside the margin pieces can be templated and cut out.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.riversideboatworks.com/2010/03/468/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title></title>
		<link>http://www.riversideboatworks.com/2009/11/465/</link>
		<comments>http://www.riversideboatworks.com/2009/11/465/#comments</comments>
		<pubDate>Mon, 16 Nov 2009 02:45:48 +0000</pubDate>
		<dc:creator>Riverside Boatworks</dc:creator>
				<category><![CDATA[Shop notes]]></category>

		<guid isPermaLink="false">http://www.riversideboatworks.com/?p=465</guid>
		<description><![CDATA[Sitka II Cabintop construction- main cabintop is on and forward cabintop is built and on. Windshields go in next after some  more design considerations.

]]></description>
			<content:encoded><![CDATA[<p id="top" />Sitka II Cabintop construction- main cabintop is on and forward cabintop is built and on. Windshields go in next after some  more design considerations.</p>
<p><img class="aligncenter size-medium wp-image-466" title="Nov 16 2009 005" src="http://www.riversideboatworks.com/wp-content/uploads/2009/11/Nov-16-2009-005-300x225.jpg" alt="Nov 16 2009 005" width="300" height="225" /></p>
]]></content:encoded>
			<wfw:commentRss>http://www.riversideboatworks.com/2009/11/465/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title></title>
		<link>http://www.riversideboatworks.com/2009/11/434/</link>
		<comments>http://www.riversideboatworks.com/2009/11/434/#comments</comments>
		<pubDate>Thu, 12 Nov 2009 00:24:15 +0000</pubDate>
		<dc:creator>Riverside Boatworks</dc:creator>
				<category><![CDATA[Shop notes]]></category>

		<guid isPermaLink="false">http://www.riversideboatworks.com/?p=434</guid>
		<description><![CDATA[Zeeto deck work- The hull work has been completed over the last several winters and now the decks and cabin house need attention. We are going to remove the many layer of paint and who know what coatings that have been applied to the plywood decks. We will remove the buildup coatings down to fiberglass [...]]]></description>
			<content:encoded><![CDATA[<p id="top" />Zeeto deck work- The hull work has been completed over the last several winters and now the decks and cabin house need attention. We are going to remove the many layer of paint and who know what coatings that have been applied to the plywood decks. We will remove the buildup coatings down to fiberglass sheathing. Doug H. Zeetos owner plans a wood decking overlay so we are trying to beat the weather and getting the dirty work done before the boat gets covered.</p>
<p><img class="aligncenter size-medium wp-image-436" title="Trawler-2 013" src="http://www.riversideboatworks.com/wp-content/uploads/2009/11/Trawler-2-0131-300x225.jpg" alt="Trawler-2 013" width="300" height="225" />There is no easy way to do this work -chisel and careful work with a 8&#8243; disc grinder.</p>
<p><img class="aligncenter size-medium wp-image-437" title="Trawler-2 011" src="http://www.riversideboatworks.com/wp-content/uploads/2009/11/Trawler-2-011-300x225.jpg" alt="Trawler-2 011" width="300" height="225" />The wet looking spots are where we applied epoxy resin to any area of the fiberglass sheathing the was nicked or looked thin. We are working outside in northern Minnesota nearing the middle of November on 50 degree day.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.riversideboatworks.com/2009/11/434/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title></title>
		<link>http://www.riversideboatworks.com/2009/11/431/</link>
		<comments>http://www.riversideboatworks.com/2009/11/431/#comments</comments>
		<pubDate>Thu, 12 Nov 2009 00:10:29 +0000</pubDate>
		<dc:creator>Riverside Boatworks</dc:creator>
				<category><![CDATA[Shop notes]]></category>

		<guid isPermaLink="false">http://www.riversideboatworks.com/?p=431</guid>
		<description><![CDATA[Sitka II cabinhouse construction-
Setting the main cabin top onto the beams
Once we locate the cabintop we will cut the edges to follow the shape of the cabinside and cabinfront

]]></description>
			<content:encoded><![CDATA[<p id="top" />Sitka II cabinhouse construction-</p>
<p>Setting the main cabin top onto the beams</p>
<p><img class="aligncenter size-medium wp-image-430" title="Trawler-2 005" src="http://www.riversideboatworks.com/wp-content/uploads/2009/11/Trawler-2-005-300x225.jpg" alt="Trawler-2 005" width="300" height="225" />Once we locate the cabintop we will cut the edges to follow the shape of the cabinside and cabinfront</p>
<p><img class="aligncenter size-medium wp-image-432" title="Trawler-2 008" src="http://www.riversideboatworks.com/wp-content/uploads/2009/11/Trawler-2-008-300x225.jpg" alt="Trawler-2 008" width="300" height="225" /></p>
]]></content:encoded>
			<wfw:commentRss>http://www.riversideboatworks.com/2009/11/431/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title></title>
		<link>http://www.riversideboatworks.com/2009/11/427/</link>
		<comments>http://www.riversideboatworks.com/2009/11/427/#comments</comments>
		<pubDate>Wed, 11 Nov 2009 21:12:25 +0000</pubDate>
		<dc:creator>Riverside Boatworks</dc:creator>
				<category><![CDATA[Shop notes]]></category>

		<guid isPermaLink="false">http://www.riversideboatworks.com/?p=427</guid>
		<description><![CDATA[The main cabin beams are glued in ready for the cabin top to be fit

]]></description>
			<content:encoded><![CDATA[<p id="top" />The main cabin beams are glued in ready for the cabin top to be fit</p>
<p><img class="aligncenter size-medium wp-image-428" title="Trawler-1 108" src="http://www.riversideboatworks.com/wp-content/uploads/2009/11/Trawler-1-108-300x225.jpg" alt="Trawler-1 108" width="300" height="225" /></p>
]]></content:encoded>
			<wfw:commentRss>http://www.riversideboatworks.com/2009/11/427/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title></title>
		<link>http://www.riversideboatworks.com/2009/11/418/</link>
		<comments>http://www.riversideboatworks.com/2009/11/418/#comments</comments>
		<pubDate>Wed, 11 Nov 2009 01:36:19 +0000</pubDate>
		<dc:creator>Riverside Boatworks</dc:creator>
				<category><![CDATA[Shop notes]]></category>

		<guid isPermaLink="false">http://www.riversideboatworks.com/?p=418</guid>
		<description><![CDATA[Before building the new plywood epoxy sheathed cabinsides we had to build a new steel cabin sole structure. We raised the cabin sole up 18&#8243;. We also needed to weld in flange on the side deck that was fair and gave as secure attachment for the cabin sides

This next picture shows the cabin sole framing [...]]]></description>
			<content:encoded><![CDATA[<p id="top" />Before building the new plywood epoxy sheathed cabinsides we had to build a new steel cabin sole structure. We raised the cabin sole up 18&#8243;. We also needed to weld in flange on the side deck that was fair and gave as secure attachment for the cabin sides</p>
<p><img class="aligncenter size-medium wp-image-417" title="Trawler-1 004" src="http://www.riversideboatworks.com/wp-content/uploads/2009/11/Trawler-1-004-300x225.jpg" alt="Trawler-1 004" width="300" height="225" /></p>
<p>This next picture shows the cabin sole framing going in.</p>
<p><img class="aligncenter size-medium wp-image-419" title="Trawler-1 019" src="http://www.riversideboatworks.com/wp-content/uploads/2009/11/Trawler-1-019-300x225.jpg" alt="Trawler-1 019" width="300" height="225" /></p>
<p>Attaching the 3/4&#8243; marine plywood to the steel flange. The ply is bolted and glued with 3m 5200.</p>
<p><img class="aligncenter size-medium wp-image-420" title="Trawler-1 033" src="http://www.riversideboatworks.com/wp-content/uploads/2009/11/Trawler-1-033-300x225.jpg" alt="Trawler-1 033" width="300" height="225" /></p>
]]></content:encoded>
			<wfw:commentRss>http://www.riversideboatworks.com/2009/11/418/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title></title>
		<link>http://www.riversideboatworks.com/2009/11/414/</link>
		<comments>http://www.riversideboatworks.com/2009/11/414/#comments</comments>
		<pubDate>Tue, 10 Nov 2009 23:54:47 +0000</pubDate>
		<dc:creator>Riverside Boatworks</dc:creator>
				<category><![CDATA[Shop notes]]></category>

		<guid isPermaLink="false">http://www.riversideboatworks.com/?p=414</guid>
		<description><![CDATA[One of winter projects is building a new cabin, interior and installing all the systems on a 45&#8242; steel trawler. Here is a picture of the bare hull after we removed the exisitng cabin house

]]></description>
			<content:encoded><![CDATA[<p id="top" />One of winter projects is building a new cabin, interior and installing all the systems on a 45&#8242; steel trawler. Here is a picture of the bare hull after we removed the exisitng cabin house</p>
<p><img class="aligncenter size-medium wp-image-415" title="Trawler-1 001" src="http://www.riversideboatworks.com/wp-content/uploads/2009/11/Trawler-1-0015-300x225.jpg" alt="Trawler-1 001" width="300" height="225" /></p>
]]></content:encoded>
			<wfw:commentRss>http://www.riversideboatworks.com/2009/11/414/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

